Museum Highway 60 Traffic Modeling

From Researchandideas
Revision as of 23:25, 30 March 2018 by Pickens (talk | contribs) (Created page with "On March 30, 2018 Hugh Pickens investigated the traffic flow along Highway past the site of the future '''Doctor Pickens Museum of Turquoise Jewelry and Art.''' Starting at 94...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

On March 30, 2018 Hugh Pickens investigated the traffic flow along Highway past the site of the future Doctor Pickens Museum of Turquoise Jewelry and Art. Starting at 940am Pickens spent 30 minutes counting the number of cars that passed a fixed point on the highway. Measurements were made a one minute intervals.